Genesis Energy

Operational & Completed Projects

WhatsApp Image 2026-06-03 at 14.54.35

PHRC Project

Location Capacity Technology COD Status
Port Harcourt,NG
84 MW
Clean Gas
2014
Operational

We operate Nigeria’s largest licensed private off-grid clean power plant, which is located at the NNPC’s Port Harcourt Refinery.

Banana_Island_Project_Nigeria

BANANA ISLAND Project

Location Capacity Technology COD Status
Lagos,NG
21 MW
Local Grid
2014
Operational

In the affluent enclave of Banana island,Lagos. Genesis Energy operate a 21MW electricity distrubution network,providing reliable power to one of Nigeria ‘s most prestigious residential Areas.

NIDI

NIDI Project

Location Capacity Technology COD Status
Kano,NG
1.5 MW
Micro-LNG
2023
Operational

Genesis Energy commissioned the first micro LNG facility in Africa, with a capacity of 1.5MW, at NIDI in Kano.

KAT_PROJECT

Project KATS

Location Capacity Technology COD Status
Katsina,NG
1.2MWp
Solar PV + BESS
2023
Operational

Genesis Energy deployed solar energy solution to health and educational institutions in Kastina State.

mini grid

Distributed Renewables

Location Capacity Technology COD
Multiple Location
300 MW
Solar PV + BESS

We have distributed Rooftop installations in Nigeria, Rwanda, Zimbabwe with a capacity of approximately 300 MW and their status is operational.